Licensed & Insured Second Generation 8+ Years in Naples
508-335-9136  ·  wagepainting@gmail.com
Overview

Naples epoxy flooring done the right way.

Most failed epoxy floors fail for the same reason: the installer acid-etched the concrete instead of diamond-grinding it. The coating sticks for a year, then starts to peel and flake under hot tires. We diamond-grind every floor — non-negotiable.

On top of proper prep, we use commercial-grade epoxy base coats and polyaspartic or polyurethane topcoats. The difference between a $500 big-box kit and a properly installed floor system is decades of service life.

Our Process

How A Project Works.

Every epoxy flooring project follows the same steps. No surprises, no shortcuts.

1

Surface inspection

We check the concrete for cracks, moisture issues, prior coatings, and any structural concerns.

2

Diamond grinding

The single most important step. We mechanically profile the concrete so the epoxy bonds for the long haul. Acid etching is not enough.

3

Crack repair and patching

Any cracks or pits filled with structural repair compound and leveled before coating goes down.

4

Base coat

High-build epoxy applied at proper thickness — the foundation of the system.

5

Decorative flakes

Vinyl flakes broadcast into the wet base coat for the speckled appearance, added texture, and a more forgiving surface.

6

Topcoat

UV-stable polyaspartic or polyurethane topcoat — the layer that gives epoxy its gloss and chemical resistance.

7

Cure and walkthrough

Floor is walk-able next day. Vehicle-ready in 2–3 days. Final inspection and care guide handed off.

Why N. Wage Painting

What Sets Our Epoxy Work Apart.

Diamond grinding, always

Cheaper installers acid-etch and the coating peels in 2–3 years. We don't cut that corner.

Commercial-grade systems

Not big-box garage floor kits. Hot tire pickup, chemical resistance, and UV stability built in.

Multi-year warranty

Backed by our own multi-year warranty plus the manufacturer's. Terms in writing on every project — no fine print, no exclusions buried in the fine print.

Recent Work

Naples Epoxy Projects.

A selection of recent epoxy flooring jobs across Naples and SW Florida.

View Full Portfolio
FAQ

Epoxy Painting Questions, Answered.

How long does an epoxy floor last?

A properly installed epoxy floor with diamond grinding and a polyaspartic topcoat lasts 15–25 years. Cheaper acid-etch installations typically fail in 2–3 years.

Can vehicles drive on it?

Yes — that's what it's built for. Hot tire pickup (where tires lift the coating off in summer) is prevented by proper installation. Vehicles can return 2–3 days after install.

Will it work over old concrete?

Yes, even decades-old concrete, as long as it's structurally sound. We diamond-grind to give the new coating a fresh, clean surface to bond to.

What about cracks in my floor?

Minor cracks are repaired during prep. Major structural cracks with active movement need to be evaluated case-by-case before we commit to a coating system.

How long until I can use the garage?

Foot traffic next day. Vehicles in 2–3 days. Heavy chemicals or pressure washing after a full 7-day cure.

Ready For An Estimate?

Let's Talk About Your Project.

Free, no-pressure estimates. We respond quickly — within 24 hours guaranteed.

Other Services

Explore What Else We Do.

Call Us Free Estimate